In fact, it was the most significant, thus far, for 2011.
Two of the rip-raps, which were built to slow/claim the stream flow, have been completely breached.
The severe down-cutting in Turkey Branch is increasing in spite of the restoration project.
The storm was a lot of trash down-stream including a smoke detector and PVC pipes!


No comments:
Post a Comment